Technology drives creativity and quicker, more cost-effective projects. A step change for our industry.
See how we connect innovation to outcomes.
Meet some of our passionate problem-solvers, constructive creatives and inspiring innovators
Today, Network Rail has responsibility for nearly 200,000 embankments and cuttings, which can pose a significant geotechnical risk, particularly during periods of extreme weather.
“Failures are a regular occurrence,” explained Chris Power, principal engineering geologist with Mott MacDonald. “The vast majority of these earthworks were constructed over 150 years ago, before the development of modern engineering practice.”
His team has played an instrumental role in developing an integrated set of policies, procedures, standards and tools to allow Network Rail to plan for the maintenance and renewal of their earthworks now, and into the future. “This body of work has stood up to regulatory scrutiny, and it allows the performance of the assets to be measured, relative to the investment made into their condition,” he added.
To date, the work has included:
Our work has allowed Network Rail to more precisely focus their investment in the earthwork assets to reduce both the likelihood and consequence of earthworks failures, and ultimately derailments.
The vast majority of these earthworks were constructed over 150 years ago, before the development of modern engineering practice.Chris PowerPrincipal engineering geologist